Modified Roof To Silicone

This is a modified roof on one of our local schools. Modified roof was power washed.  Blistered areas were cut out and primer was applied to the entire roof.  All penetrations were treated with trowel grade silicone.  Polyurea was applied to all seams and 38 mils of silicone was applied to the entire roof.

Before

After

2018-10-16 12.47.04
2018-10-16 16.31.38
1/4

Before Roof Replacement

2018-10-16 12.47.05
2018-10-16 12.47.04
2018-10-16 12.46.20
2018-10-16 12.46.49
2018-10-16 12.46.23
2018-10-16 12.46.12
2018-10-16 12.46.08
2018-10-16 12.44.03
2018-10-16 12.43.49
2018-10-16 10.49.40
2018-10-16 10.45.54
2018-10-16 10.49.16
2018-10-16 10.49.30
2018-10-16 10.49.12
2018-10-16 10.49.06
2018-10-16 10.49.03
2018-10-16 10.49.00
2018-10-16 10.48.54
2018-10-16 10.48.49
2018-10-16 10.46.25
2018-10-16 10.48.46
2018-10-16 10.46.21
2018-10-16 10.45.32 HDR
2018-10-16 10.45.51
2018-10-16 10.40.08
2018-10-16 10.40.06
2018-10-16 10.38.42
2018-10-16 10.38.39
2018-10-16 10.38.37
2018-10-16 10.38.35
2018-10-16 10.38.16
2018-10-16 10.38.14 HDR
2018-10-16 10.37.58
2018-10-16 10.45.30-1
2018-10-16 10.45.52
1/1

During Roof Replacement

2018-10-16 13.12.52
2018-10-16 14.40.16
2018-10-16 14.40.53
2018-10-16 14.41.01
2018-10-16 14.40.15
2018-10-16 14.40.20
2018-10-16 14.40.33
2018-10-16 15.52.58
2018-10-16 15.44.44
2018-10-16 15.44.55
2018-10-16 15.16.32
2018-10-16 15.16.29
2018-10-16 15.06.12
2018-10-16 14.56.52
2018-10-16 15.05.59
2018-10-16 14.57.38
2018-10-16 14.56.07
2018-10-16 14.56.46
2018-10-16 15.06.28
2018-10-16 15.52.58
2018-10-16 15.45.03
1/1

After Roof Replacement

2018-10-16 16.31.52
2018-10-16 16.13.23
2018-10-16 16.31.50
2018-10-16 15.54.05
2018-10-16 15.54.12
2018-10-16 15.54.15
2018-10-16 16.49.32
2018-10-16 16.49.29
2018-10-16 16.49.25
2018-10-16 16.49.28
2018-10-16 16.31.38
2018-10-16 16.31.40
after 1
After
1/1